This manual introduces Goulds Water Technology deep water jet pump installation, operation and troubleshooting information.
The document provides comprehensive instructions for selecting the correct jet pump system based on application needs, such as shallow wells (up to 25 feet lift) or deep wells. It details requirements for different pump types, including vertical and horizontal designs, single and multi-stage models, and specific components like twin-pipe or packer systems.
The guide offers step-by-step procedures for preparing the installation site, inspecting equipment, and configuring piping systems. It includes specific instructions for shallow well installations, discharge piping setups (on-line vs off-line tanks), and seasonal maintenance recommendations to ensure proper operation and longevity of the unit.
| Maximum Suction Lift (Shallow Well) | 25' |
|---|---|
| Liquid Temperature Limit | 140° F (60°C) |
The maximum suction lift for a shallow well system is 25 feet, which includes actual vertical lift plus friction loss in the suction piping.
The liquid temperature must not exceed 140° F (60°C).
Goulds ½ hp Jet pumps are factory pre-wired for 115 volts.