Seakeeper 35/30HD Installation Manual

This installation manual introduces the installation steps of Seakeeper 35, including mechanical installation, electrical installation, cooling installation, startup and check list


Seakeeper 35/30HD Installation Manual - cover page
Brand
Seakeeper
Document type
Installation Guide
Language
English
Pages
49
File format
PDF
File size
5.2 MB
Published
15 October, 2023
Updated
15 October, 2023
MD5 checksum
307D715450534DBEB735AF370A39A1C8

About this manual

The document serves as a comprehensive guide for installing the Seakeeper 35 or 30HD motion stabilization system on vessels. It details two primary installation methods: Bolt-In and Bond-In (Saddle) installation, providing specific requirements for hull structure preparation, load transfer analysis, and safety precautions regarding lifting and handling.

What's inside

  • Mechanical Installation
  • Electrical Installation
  • Cooling Installation
  • Startup Procedures
  • Installation Checklist
  • Safety Precautions
  • Lifting Arrangement
  • Hull Structure Preparation

Specifications

Maximum Load per Mount41.3kN (9,270 lbs.)
Coast Down Timearound 5 hours

Frequently asked questions

What are the two methods for installing the Seakeeper?

The system can be installed using either a Bolt-In method or a Bond-In (Saddle) installation.

Where should the Seakeeper be installed on the vessel?

It must be installed aft of amidships to minimize high acceleration loadings due to hull/wave impacts.

What is the minimum cooling water flow required?

A minimum flow rate of 10 GPM (38 LPM) is required for operation.

Download PDF (5.2 MB)

More Seakeeper Manuals


View all Seakeeper manuals →