This installation manual introduces the installation steps of Seakeeper 35, including mechanical installation, electrical installation, cooling installation, startup and check list
The document serves as a comprehensive guide for installing the Seakeeper 35 or 30HD motion stabilization system on vessels. It details two primary installation methods: Bolt-In and Bond-In (Saddle) installation, providing specific requirements for hull structure preparation, load transfer analysis, and safety precautions regarding lifting and handling.
| Maximum Load per Mount | 41.3kN (9,270 lbs.) |
|---|---|
| Coast Down Time | around 5 hours |
The system can be installed using either a Bolt-In method or a Bond-In (Saddle) installation.
It must be installed aft of amidships to minimize high acceleration loadings due to hull/wave impacts.
A minimum flow rate of 10 GPM (38 LPM) is required for operation.