Bright Computing Bright 9.1 Upgrade Manual

This document describes the procedure for upgrading Bright clusters to version 9.1. It should be read very carefully before carrying out an upgrade.


Bright Computing Bright 9.1 Upgrade Manual - cover page
Brand
Bright Computing
Document type
User Manual
Language
English
Pages
19
File format
PDF
File size
162 KB
Published
13 October, 2023
Updated
13 October, 2023
MD5 checksum
98D06F2FB64404AC9A7F70CFF29FB997

About this manual

This document details the procedures for upgrading Bright clusters from supported previous versions (8.2 or 9.0) to version 9.1. It covers both in-place upgrades and the new parallel upgrade functionality, which allows cloning a production head node to an upgraded setup while maintaining cluster operation.

What's inside

  • Supported Versions
  • Parallel Upgrades
  • Configuration Changes
  • Local Data Handling
  • Network File Systems
  • Cluster Extensions
  • Prerequisites
  • Workload Managers

Frequently asked questions

Which Bright versions are supported for upgrade to version 9.1?

Upgrades from Bright 9.0 and Bright 8.2 are supported.

Is parallel upgrade supported for clusters with cloud extensions?

No, parallel upgrades of clusters extended to the cloud are not supported; only in-place upgrades are possible.

Are Torque and SGE workload managers supported in Bright 9.1?

No, Torque and SGE are not supported and will be removed during the upgrade.

Download PDF (162 KB)

More Bright Computing Manuals


View all Bright Computing manuals →