ONICON F-3500 Insertion Electromagnetic Flow Meter Installation and Operation Guide

This is the installation and operation manual for the ONICON F-3500 electromagnetic flow meter.


ONICON F-3500 Insertion Electromagnetic Flow Meter Installation and Operation Guide - cover page
Brand
Onicon
Category
Industrial Supply
Document type
User Manual
Language
English
Pages
28
File format
PDF
File size
1001 KB
Published
12 October, 2023
Updated
12 October, 2023
MD5 checksum
FC92C76787C0255AE826727BD30D393F

About this manual

This manual serves as a reference tool for the installation, operation, and maintenance of the ONICON F-3500 Insertion Electromagnetic Flow Meter. It covers safety precautions, unpacking procedures, and detailed installation steps for both standard and hot tap configurations. The guide also explains the meter's operating principles based on Faraday's Law and provides instructions for wiring connections and startup commissioning.

What's inside

  • Safety Information
  • Introduction
  • Unpacking
  • Installation Site Selection
  • Mechanical Installation
  • Insertion of the Meter
  • Removal of the Meter
  • Wiring Connections
  • Start-Up & Commissioning
  • Troubleshooting Guide

Specifications

Accuracy± 1.0% of reading from 2 to 20 ft/sec
Pipe Size RangeStandard: 3-72" nominal; Small Pipe: 1¼-2½" nominal
Input Power20 - 28 VAC 50/60Hz, 250 mA maximum
Liquid Temperature Range15° to 250° F
Operating Pressure400 PSI maximum
Materials of ConstructionWetted metal components - 316L stainless steel
Output SignalAnalog output (Isolated), selectable 4-20 mA, 0-10 V or 0-5 V

Frequently asked questions

What safety precautions must be observed during installation?

Persons must have complete knowledge of their trade skills and be competent to work on high pressure hot and cold water and steam systems.

Can the meter be installed in pressurized systems?

Yes, using a 'Hot tap' installation kit and a 1 inch wet tap drill to access the pipe while the system is operating.

Is grounding required for the meter?

Grounding rings are required before and after the meter whenever it is installed in non-metallic or lined pipes to eliminate electrical noise.

Download PDF (1001 KB)