Weil-McLain CER Series 2 Electric-Hydronic Boilers Installation Instructions

This document is the installation instructions for CER Series 2 electric-hydronic boilers.


Weil-McLain CER Series 2 Electric-Hydronic Boilers Installation Instructions - cover page
Brand
Weil-McLain
Category
Other
Document type
Installation Guide
Language
English
Pages
16
File format
PDF
File size
288 KB
Published
12 October, 2023
Updated
12 October, 2023
MD5 checksum
A94A2DC307D5FCC24F3E6521A14CC592

About this manual

This manual provides installation instructions for the Weil-McLain CER Series 2 electric-hydronic boilers. It covers pre-installation steps, including locating the boiler and mounting it to a wall or frame. The document details requirements for electrical service, ventilation clearances, and wall support structures.

What's inside

  • Pre-installation
  • Locating the boiler
  • Mounting the boiler
  • Expansion tank sizing
  • Hydrostatic pressure test
  • Piping the boiler
  • Wiring the boiler
  • Control system

Specifications

Product TypeElectric-Hydronic Boilers
Included ComponentsSupplied without circulator or expansion tank
Top Clearance6 inches
Right Side Clearance18 inches
Bottom Clearance2 inches
Mounting Hole Centers16-inch centers

Frequently asked questions

Who should install this boiler?

These instructions must be used only by a qualified installer/service technician.

What type of wire should not be used?

Aluminum wire must not be used for wiring the boiler.

What is the minimum top clearance required?

A minimum of 6 inches is required at the top of the boiler for installation and accessories.

Download PDF (288 KB)