Crusader Water CWS 5-031/6-061 UV Disinfection System Operation & Installation Instructions

This document provides operation and installation instructions for the Crusader Water Systems UV Disinfection system. The system is capable of effectively inactivating microorganisms in the water supply, ensuring safe drinking water. The system features simple maintenance, continuous disinfection, and safe water supply.


Crusader Water CWS 5-031/6-061 UV Disinfection System Operation & Installation Instructions - cover page
Brand
Crusader Water
Category
Other
Document type
User Manual
Language
English
Pages
26
File format
PDF
File size
2.6 MB
Published
23 August, 2022
Updated
28 September, 2023
MD5 checksum
DABA3678E275EA67946B2E4D42DC48AA

About this manual

This manual provides operation and installation instructions for Crusader Water Systems UV disinfection systems, including models CWS 5-031 through CWS 6-201. It outlines safety considerations, required tools, and water quality parameters necessary for effective disinfection.

The document details the assembly process, including unpacking components, selecting a suitable location within 5 feet of a GFCI, and installing the reactor horizontally or vertically. It also covers the installation steps for copper plumbing, quartz sleeve assembly, and connecting the UV sensor for Crusader6.0 models.

What's inside

  • Safety Considerations
  • Before You Begin
  • Water Quality Parameters
  • Assembly
  • System Sizing
  • Location
  • Installation
  • System Disinfection
  • Cleaning the Quartz Sleeve
  • Operation

Specifications

Recommended pre-filtrationat least 5 microns
Controller location distancewithin 5 feet of a GFCI
Hardness limit<7 gpg (120 mg/L)
Iron limit<0.3 ppm (0.3 mg/L)
Manganese limit<0.05 ppm (0.05 mg/L)
Turbidity limit< 1 NTU
Tannins limit<0.1 ppm (0.1 mg/L)
UVT requirement>85%

Frequently asked questions

What tools are needed for installation?

You will need a pipe cutter or hacksaw, soldering tools (torch, flux, emery cloth, and solder), and a wrench for tightening fittings.

Can the UV reactor be installed vertically?

Yes, the reactor can be installed either horizontally or vertically, though vertical installation with the inlet at the bottom is the preferred method.

Where should the UV system be installed in the plumbing?

For Point of Entry (POE), it should be the last piece of treatment before water branches to hot and cold lines. For Point of Use (POU), it should be the final step before the faucet.

What is the recommended water hardness level?

The water hardness should be less than 7 gpg (120 mg/L) to ensure efficient UV penetration without excessive cleaning of the quartz sleeve.

Download PDF (2.6 MB)