SUPERVISION 150C Light Source Installation Manual

This document is about the introduction, installation, control systems and settings, general operation and maintenance, and troubleshooting of the 150C light source. The document emphasizes safety precautions and provides installation and operation guidelines.


SUPERVISION 150C Light Source Installation Manual - cover page
Brand
SUPERVISION
Document type
Installation Guide
Language
English
Pages
15
File format
PDF
File size
342 KB
Published
06 August, 2012
Updated
28 September, 2023
MD5 checksum
0FA8A1804036E6C47CCE4EE5BEB3C538

About this manual

The document serves as an owner's and installation guide for the SUPERVISION 150C light source. It outlines critical safety warnings regarding electrical connections, hot surfaces, and proper ventilation requirements before beginning setup.

Detailed instructions cover site preparation for surface or burial mounting, conduit and fiber optic cable assembly, unit disassembly and reassembly, and specific steps for installing the fiber head assembly.

What's inside

  • Introduction
  • Specifications
  • Site Preparation
  • Conduit Preparation
  • Fiber Preparation
  • Disassemble Unit
  • Mount Unit
  • Electrical Connections
  • Fiber Head Assembly Installation
  • Reassemble Unit

Specifications

Input Voltage/Current120 VAC, 60Hz / 4.0 Amps
Lamp Type150 watt metal halide
Maximum Power Consumption450 Watts maximum
Operating Temperature-29°C to 44°C
Fan Life Hours80,000 life hours
Warranty Period1 Year, excluding lamp

Frequently asked questions

What is the maximum burial depth for the unit?

The unit can be buried a maximum of 5 inches measured from the bottom of the unit.

What type of conduit fittings should be used?

Sweep elbows must be used for fiber optic conduit; 90° plumbing fittings are not allowed.

Download PDF (342 KB)