This document mainly introduces the detection and treatment methods of common faults of Super Vision fiber optic lights
The document serves as an installation guide for the Super Vision SV150T Light Source. It details site preparation, electrical requirements (120VAC/60Hz or 220VAC/50Hz), and physical assembly steps including base positioning and tower securing. The unit features a proprietary 150-watt metal halide lamp with an average life of 10,000 hours.
| Voltage | 120VAC, 60Hz / 220 VAC , 50Hz |
|---|---|
| Fiber Capacity | 550 strands |
| Lamp Type | 150 watt Metal halide |
| Average Lamp Life | 10,000 hours |
The restrike period is 3-5 minutes to allow the lamp to cool down.
Check if the power switch is in the ON position, check remote control batteries if applicable, and ensure proper wiring.
If the lamp is OFF but the fan is ON, shut off the unit immediately and replace the lamp.