This document is an installation instruction for F-300, D-300, and U-300 series flowmeters. It provides requirements and steps for installing the flowmeters, as well as cautionary notes for using different types and sizes of pipes.
This document provides installation instructions for Blue-White F-300, D-300, and U-300 series flowmeters. It specifies that the meters must be installed on straight horizontal or vertical piping and details the correct pipe types for different model suffixes, such as PVC or copper tubing. The guide includes safety warnings, such as wearing eye protection, and step-by-step assembly instructions involving the pitot tube and clamps.
| Maximum Temperature | 190°F (87.8°C) |
|---|---|
| Maximum Pressure | 150 PSI (10.34 Bar) |
| Accuracy | +/- 10% |
| Suitable Fluids | Air and water only |
Models with suffix 'P' or 'PR' are for PVC pipe, while 'T' or 'TR' are for copper tubing.
You must wear eye protection when installing or removing the flowmeter.
Clean the body and parts with mild soap and water, using a soft bristle brush inside the body.