Introduces the operating method of ADVANCE BF
This manual provides instructions for the Defi-Link Meter ADVANCE CR and BF, which are additional products for providing automobile users with information about engine conditions. These meters must be used in conjunction with the Defi-Link ADVANCE Control unit and do not function alone. The document covers safety warnings, installation precautions, and operational guidelines for customers and installation personnel.
This product is designed specifically for use on 12V vehicles and should not be installed on vehicles with 24V systems.
One advance control unit can control up to 7 gauges.
The ignition-switched +12V(IGN) line must be connected with a fuse of 30A or less.