Agilent GC MSD ALS Site Preparation Checklist

This document is a checklist for the site preparation of Agilent Technologies Agilent GC, MSD, and ALS equipment. It outlines the requirements for the dimensions, weight, power supply, environmental conditions, gas selection and supply, as well as the exhaust requirements and necessary basic tools. It also mentions the availability of required supplies and consumables.


Agilent GC MSD ALS Site Preparation Checklist - cover page
Brand
Agilent
Document type
Installation Guide
Language
German
Pages
14
File format
PDF
File size
601 KB
Published
08 June, 2012
Updated
29 September, 2023
MD5 checksum
71B8884E4CB208AA4CB30E5508C582C5

About this manual

This document serves as a site preparation checklist to ensure the successful installation of Agilent GC, MSD, and ALS systems. It outlines the necessary spatial dimensions, power supply specifications, heat dissipation requirements, and environmental conditions before installation begins.

The guide provides specific tables for physical dimensions and weights of various models (Series 5975, 6850, 6890, 7890A), electrical connection details including voltage and amperage ratings, heat emission data in BTU per hour, and operating temperature ranges. It also lists compatible gases for different detectors and includes a list of basic tools required for setup. This manual is written in German.

What's inside

  • Abmessungen und Gewicht
  • Stromversorgung
  • Warmeabstrahlung
  • Umgebungsbedingungen
  • Gasauswahl
  • Basiswerkzeuge

Specifications

Storage Temperature Range5 to 40 °C
Weight (MSD Series 5975)39 kg (85 lb)

Frequently asked questions

What is the minimum clearance required between the back of the GC and the wall?

At least 20 cm.

Which carrier gas must be used for performance testing?

Helium.

Download PDF (601 KB)

More Agilent Manuals


View all Agilent manuals →