TE118 operation manual, introducing the product configuration, installation, key operation, parameter setting, system debugging and other contents
This manual introduces the TE118 control system, covering safety precautions that must be read before installation and the need for external safety circuits to protect the machine. It also outlines warranty limits and the company’s responsibility for system‑related faults.
The document details system configuration, hardware installation, key‑panel operation, parameter and function settings, production management, system debugging, and input/output status monitoring. Appendices provide wiring diagrams, dimension drawings and interference‑suppression tips. This manual is written in Chinese.
| Control system model | PS860AM |
|---|---|
| Control system model | PS900AM |
| Power supply | PW600B 6008 |
| Analog‑digital conversion | 8‑channel AD electronic ruler / pressure feedback |
| Digital‑analog output | 6‑channel standard DA, max 3 A output |