Tekna EVO instruction manual, introduces the installation and start-up guide of AKS AKL series electromagnetic pumps, pump head material, precautions, wiring, pipeline connection and other content
This guide covers the installation of the Tekna EVO system, including mounting the control panel, connecting liquid‑contact parts, and securing all fittings. Detailed safety warnings advise cutting power before any work, using compatible chemicals, and observing temperature limits.
The manual also lists required accessories, explains how to adjust flow rates, and provides troubleshooting steps for common issues such as blockages, leaks, and insufficient flow. Regular maintenance, such as checking fixing bolts after 800 hours, is described to ensure reliable operation. This manual is written in Chinese.
Before any operation, cut the power source, follow the safety instructions for handling fluids, and ensure the device is installed in an environment below 40 °C with an IP65 rating.
The fixing bolts should be inspected and tightened after about 800 hours of operation.
The liquid‑contact part is compatible with PVDF, PTFE, and ceramic materials.