Sengpar B05 Series Steam Shower Installation Manual

This manual is for the use of the Sengpar B05 series steam room, which includes product features, installation steps, and maintenance instructions.


Sengpar B05 Series Steam Shower Installation Manual - cover page
Brand
星派卫浴
Category
Other
Document type
Installation Guide
Language
Chinese
Pages
20
File format
PDF
File size
2.7 MB
Published
14 March, 2012
Updated
30 September, 2023
MD5 checksum
1649B666AA0F44C8C8C23E7BE7FB70C9

About this manual

This manual provides step‑by‑step instructions for installing the Sengpar B05 series steam shower, covering pre‑installation checks, pipe and electrical connections, and mounting of the back panel, side and front glass, and inner top panel. It also lists the required tools, safety precautions, and the technical specifications such as voltage, frequency and power ratings.

Additional sections describe proper use, routine maintenance, cleaning procedures, and a troubleshooting guide for common faults like water‑level sensor issues, power failures, and steam generator problems. The document emphasizes compliance with CE standards and the need for qualified personnel during installation. This manual is written in Chinese.

What's inside

  • Safety Precautions
  • Pre‑Installation Checklist
  • Technical Specifications
  • Installation Steps
  • Water‑Level Sensor Installation
  • Operation Instructions
  • Troubleshooting
  • Back Panel Installation
  • Side Glass Installation
  • Front Glass Installation

Specifications

Required Drain Pipe Size1 ½ in

Frequently asked questions

How often should the steam generator be descaled in hard‑water areas?

Descaling should be performed every three months in hard‑water regions.

Download PDF (2.7 MB)

More 星派卫浴 Manuals


View all 星派卫浴 manuals →