This manual is for the use of the Sengpar B05 series steam room, which includes product features, installation steps, and maintenance instructions.
This manual provides step‑by‑step instructions for installing the Sengpar B05 series steam shower, covering pre‑installation checks, pipe and electrical connections, and mounting of the back panel, side and front glass, and inner top panel. It also lists the required tools, safety precautions, and the technical specifications such as voltage, frequency and power ratings.
Additional sections describe proper use, routine maintenance, cleaning procedures, and a troubleshooting guide for common faults like water‑level sensor issues, power failures, and steam generator problems. The document emphasizes compliance with CE standards and the need for qualified personnel during installation. This manual is written in Chinese.
| Required Drain Pipe Size | 1 ½ in |
|---|
Descaling should be performed every three months in hard‑water regions.