TLV1544EVM Evaluation Module for the TLV1544 10-Bit ADC user manual

TLV1544EVM evaluation module is a TLV1544 10-bit ADC evaluation module, which can help users quickly evaluate the performance of TLV1544.


TLV1544EVM Evaluation Module for the TLV1544 10-Bit ADC user manual - cover page
Brand
TLV1544EVM
Category
Other Electronics
Document type
User Manual
Language
English
Pages
42
File format
PDF
File size
383 KB
Published
13 February, 2012
Updated
30 September, 2023
MD5 checksum
4DC02C884D1BED5055D0642E880A402D

About this manual

This guide provides an overview of the TLV1544EVM evaluation module for the TLV1544 10‑bit ADC, including its physical description, circuit details, and operating instructions. Safety notices and warranty information from Texas Instruments are also included.

An appendix offers grounding considerations for PCB design, recommending a single ground point, separate high‑current ground traces, and limits on ground‑trace resistance to maintain signal integrity.

What's inside

  • Overview
  • Physical Description
  • Circuit Description
  • Operation
  • Grounding Considerations
  • Safety Notices

Specifications

Resolution10 bits
Reference voltage4.1 V

Frequently asked questions

What safety notice does Texas Instruments provide for this product?

Texas Instruments states that its semiconductor products are not intended for life‑support or critical applications and that use in such applications is at the customer's risk.

Download PDF (383 KB)