Sinovt QQE03-12 Push-Pull Kit User Manual

This manual introduces the characteristics of RAPHAELITE QQE03-12 push-pull kit, usage methods, precautions, etc.


Sinovt QQE03-12 Push-Pull Kit User Manual - cover page
Brand
RAPHAELITE
Category
audio amplifier
Document type
User Manual
Language
Chinese
Pages
21
File format
PDF
File size
3.1 MB
Published
07 February, 2012
Updated
30 September, 2023
MD5 checksum
336B939C4E204E97FBA41EC06C0B9801

About this manual

The QQE03-12 push‑pull kit is designed for beginners who want a low‑cost, high‑quality tube amplifier. It uses a 6F2 (ECF82) pre‑amplifier tube and a QQE03-12 (FU‑17) power tube to deliver about 8 W of output in a compact chassis. The power supply employs a high‑quality transformer and a stabilized 200 V rail for reliable operation.

The manual walks you through receiving inspection, component placement on the double‑sided PCB, wiring of the power transformer and output transformer, and provides detailed troubleshooting for common faults such as blown fuses, filament failure, and distortion. It also lists upgrade options for tubes, rectifier tubes, capacitors and resistors, and includes contact information for technical support. This manual is written in Chinese.

What's inside

  • Model Introduction
  • Receiving Inspection
  • Assembly Instructions
  • Wiring Diagram
  • Troubleshooting
  • Upgrading Options
  • Service Contact Information

Specifications

Output Power8W
Power Supply Voltage200V
Pre‑amplifier Tube6F2 (ECF82)
Power TubeQQE03-12 (FU‑17)
Output TransformerFully enclosed push‑pull type

Frequently asked questions

What should I check if the fuse blows?

Inspect the power‑transformer input wiring, verify the polarity of the high‑voltage capacitor, and ensure there is no short on the transformer secondary or rectifier pins.

How can I replace the power tube?

The QQE03-12 power tube can be replaced with other early‑model tubes such as QQE03-12, 6360, or the domestic FU‑17.

What steps should I take if the filament does not light?

Check the tube socket pin order, verify that the filament winding of the power‑transformer is not shorted, and ensure all solder joints are sound.

Download PDF (3.1 MB)

More RAPHAELITE Manuals


View all RAPHAELITE manuals →