This is a NASA flight manual that mainly introduces the operation flow of ISS-1E rendezvous and separation
The document is the final Flight Data File for the STS-123 rendezvous mission, dated November 6, 2007. It includes a change notice (PCN‑1) with a list of implemented change requests and contact information for the Mission Operations Directorate.
It contains crew checklists, timeline details for rendezvous and separation, acronyms, and failure response procedures for RCS/DPS/EPS systems. The timeline assumes a rendezvous altitude of 205 nm and targeting loads based on 210 nm, providing step‑by‑step guidance for the ISS‑1E mission.
| Planned rendezvous altitude | 205 nm |
|---|---|
| Targeting I‑Loads altitude basis | 210 nm |
It is the controlling crew document for the ISS‑1E rendezvous and separation, providing timelines and procedures for the mission.
The final version was released on November 6, 2007.