This manual introduces the operation methods of the main production scheduling (MPS) module in the SAP system, including total planning, single-item multi-level expansion, and single-item single-level expansion.
The manual explains how to use the Master Production Scheduling (MPS) functions of SAP R/3 Release 46D. It covers the purpose of MPS, required material master settings, and the two execution methods (regeneration and net change).
Detailed procedures are given for Total Planning – Online, Single‑Item Multi‑Level, and Single‑Item Single‑Level runs, including field descriptions, transaction codes, and example exercises to practice creating and converting planning orders. This manual is written in Chinese.
| Processing key options | NETCH, NETPL, NEUPL |
|---|
Enter transaction code MD40 in the command field and press ENTER to start Total Planning – Online.
The MRP type field in the material master (MRP1 screen) must be set to M0.