SAP R/3 System Release 46D Operating Manual

This manual introduces the operation methods of the main production scheduling (MPS) module in the SAP system, including total planning, single-item multi-level expansion, and single-item single-level expansion.


SAP R/3 System Release 46D Operating Manual - cover page
Brand
SAP
Document type
User Manual
Language
Chinese
Pages
50
File format
PDF
File size
1.4 MB
Published
20 January, 2012
Updated
30 September, 2023
MD5 checksum
EBFFCBB35FD7ACE368497988306B8CC3

About this manual

The manual explains how to use the Master Production Scheduling (MPS) functions of SAP R/3 Release 46D. It covers the purpose of MPS, required material master settings, and the two execution methods (regeneration and net change).

Detailed procedures are given for Total Planning – Online, Single‑Item Multi‑Level, and Single‑Item Single‑Level runs, including field descriptions, transaction codes, and example exercises to practice creating and converting planning orders. This manual is written in Chinese.

What's inside

  • Operation Overview
  • Total Planning – Online
  • MPS Single‑Item, Multi‑Level
  • MPS Single‑Item, Single‑Level
  • Planned Order
  • Exercises

Specifications

Processing key optionsNETCH, NETPL, NEUPL

Frequently asked questions

Which transaction code starts Total Planning – Online?

Enter transaction code MD40 in the command field and press ENTER to start Total Planning – Online.

What MRP type must be set in the material master to run MPS?

The MRP type field in the material master (MRP1 screen) must be set to M0.

Download PDF (1.4 MB)

More SAP Manuals


View all SAP manuals →