SPX Marley MC Closed Cooling Tower User Manual

This manual provides important information for the proper installation and operation of Marley MC closed circuit cooling towers. Please read the manual carefully and follow all instructions.


SPX Marley MC Closed Cooling Tower User Manual - cover page
Brand
SPX
Document type
User Manual
Language
Chinese
Pages
32
File format
PDF
File size
731 KB
Published
17 December, 2011
Updated
30 September, 2023
MD5 checksum
EAE5D6FB1D3F3F65EE9A89FD00A51ED8

About this manual

The manual begins with safety instructions, emphasizing proper positioning, platform leveling, and adherence to SPX safety guidelines before any work on the Marley MC cooling tower. It then details the installation process, including bolt fixation, pipe connections (13 mm size), and alignment of the tower with supporting structures.

Further sections cover lifting procedures, piping and electrical connections, routine operation, cleaning, and troubleshooting. The document also lists part numbers, provides contact information for SPX Cooling Technologies, and includes a brief warranty statement. This manual is written in Chinese.

What's inside

  • Safety
  • Installation
  • Lifting Procedure
  • Piping Connections
  • Operation
  • Cleaning
  • Troubleshooting and Repair
  • Specifications
  • Contact Information
Download PDF (731 KB)

More SPX Manuals


View all SPX manuals →