Larsson Manuals

ManualLib has 1 Larsson manual. Every file can be read online or downloaded as a PDF for free.

Product Leaflet 1

Key facts

Manuals
1
Languages
EN
Last added
2023-11-17

Latest Larsson manuals

Questions answered in Larsson manuals

What is the lead time for standard specifications?

The lead time is 30 days after payments received and drawing confirmed.

From: Larsson LRP1000-MRL Machine-Roomless Passenger Elevator Quotation

What is the payment term?

30% T/T in advance, and the rest 70% T/T 10 days before the shipment.

From: Larsson LRP1000-MRL Machine-Roomless Passenger Elevator Quotation