Featured Comanche Peak Steam Electric Station manuals

Comanche Peak Steam Electric Station Units 1 and 2 Technical Requirements Manual
This Technical Requirements Manual applies to Comanche Peak Steam Electric Station Units 1 and 2. It sets out use and application rules, technical requirement applicability, and technical requirements for reactivity control, power distribution, instrumentation, reactor coolant, emergency core cooling, containment, plant systems, electrical power, refueling, monitoring, and administrative controls.
Revision 89 of the manual references the plant Technical Specifications for definitions, logical connectors, completion times, and frequency. It also includes cross references between Technical Requirement sections and Technical Specification sections, and notes the conversion to the Improved Technical Specifications in July 1999.
Covers: Use and Application · Technical Requirement Applicability · Reactivity Control Systems · Power Distribution Limits · Instrumentation · Reactor Coolant System (RCS)
Latest Comanche Peak Steam Electric Station manuals
Comanche Peak Steam Electric Station Units 1 and 2 Technical Requirements Manual
Other 273 pages · 1.9 MB · ENTechnical Requirements Manual for Comanche Peak Steam Electric Station Units 1 and 2, covering plant technical requirements, surveillance, and applicability.
Questions answered in Comanche Peak Steam Electric Station manuals
What does the Technical Requirements Manual reference for definitions?
It refers to Technical Specifications Section 1.1, “Definitions,” for the definitions used in the manual.
From: Comanche Peak Steam Electric Station Units 1 and 2 Technical Requirements Manual
When was the conversion to the Improved Technical Specifications?
The text notes the conversion to the Improved Technical Specifications in July 1999.
From: Comanche Peak Steam Electric Station Units 1 and 2 Technical Requirements Manual