Boral Cultured Stone Cladding Installation Guide
This Boral Stone technical information guide, dated July 2013, explains how to install Cultured Stone cladding. It covers estimating the stone required, materials and tools, mortar components, water resistive barrier (WRB), flashing, expanded metal mesh, fasteners, masonry sealer and tools, followed by typical installations for timber frame, brick or block work, tilt or pre-cast panel and float and set.
Further sections deal with surface preparation, primer and mortar mix, applying the cladding, grouting and finishing joints, surface cleaning, watertable and sill installations, exterior application notes, general information such as cleaning, efflorescence and sealers, building code requirements and the warranty. The guide also contains design details (figures 10-39), a material safety data sheet, test results, notes to the installer and a specification.
Covers: Introduction · Estimating Stone Required · Materials and Tools Required · Typical Installations · Surface Preparation · Water Resistive Barrier (WRB)
Latest Boral manuals
Boral Cultured Stone Cladding Installation Guide
Installation Guide 44 pages · 2.5 MB · ENBoral Cultured Stone installation guide covering estimating stone, materials and tools, surface preparation, mortar, mesh, application and design details.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in Boral manuals
How do I estimate the total stone required?
Total stone required is the wall area minus the window and door area, minus the wall area covered by corners. Wall area is wall length times wall height.
How much flat area does one linear metre of corner pieces cover?
One linear metre of corner pieces covers approximately 0.25 square metres of flat area. This amount is subtracted from the flat stone required.