Key facts
- Manuals
- 1
- Languages
- ZH
- Last added
- 2023-10-30
Featured China Southern Power Grid manuals

China Southern Power Grid Real-Time Simulation Modeling Method for Power Grid Primary and Secondary Systems Patent
This is a Chinese invention patent application (publication number CN 110162843 A, application number 201910349184.5) filed by China Southern Power Grid Research Institute Co., Ltd. and China Southern Power Grid Co., Ltd. It discloses a method and a corresponding device for building a joint real-time simulation model that combines the primary system and the secondary system of a power grid.
The method applies the coherent equivalence method to key characteristic quantities of the actual grid to obtain electromechanical transient data and an initial grid simulation model, corrects it by comparing the quantities before and after equivalence, and performs network partitioning according to the hardware configuration of the real-time simulator. A broadband equivalent model is built for non-decouplable electromagnetic loops and local grids in non-critical areas, then an optimized primary system model containing DC systems, FACTS and generators and a matching initial secondary system model are built, together with a reinforced secondary system model containing three lines of defense; the three are jointly compiled in the real-time simulator and tuned to obtain the target real-time simulation model. This manual is written in Chinese.
Covers: Abstract · Claims · Technical Field · Background · Summary of the Invention · Description
Latest China Southern Power Grid manuals
China Southern Power Grid Real-Time Simulation Modeling Method for Power Grid Primary and Secondary Systems Patent
Other 11 pages · 541 KB · ZHChinese patent application CN 110162843 A describing a method and device for joint real-time simulation modeling of a power grid's primary and secondary…
Questions answered in China Southern Power Grid manuals
How is the initial power grid simulation model built?
The coherent equivalence method is used to dynamically process the key characteristic quantities of the actual grid, obtaining electromechanical transient data from which the initial grid simulation model is built.
How is the network partitioning design carried out?
It is done according to the hardware configuration of the real-time simulator, so that the grid area simulated by each computing unit is obtained.
