Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-10-27
Featured ThermoLazer manuals

ThermoLazer SmartDie II Screed Box 3A1738K User Manual
This manual provides operating instructions for the ThermoLazer SmartDie II Screed Box, model 3A1738K. It details the installation and removal procedures for use with ThermoLazer 200/200TC and 300TC/ProMelt pavement marking systems. The document includes specific steps for attaching gas hoses, securing the unit to the yoke, and aligning the box for optimal material delivery.
Covers: Important Safety Instructions · Linkage Rod Adjustment · Installation (ThermoLazer 200/200TC) · Removal (ThermoLazer 200/200TC) · Installation (ThermoLazer 300TC/ProMelt) · Removal (ThermoLazer 300TC/ProMelt)
Latest ThermoLazer manuals
ThermoLazer SmartDie II Screed Box 3A1738K User Manual
User Manual 24 pages · 4.4 MB · ENUser manual for the ThermoLazer SmartDie II Screed Box 3A1738K, covering installation, removal, adjustments, and safety warnings for thermoplastic traffic…
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in ThermoLazer manuals
What safety equipment is required when operating this equipment?
Operators must wear appropriate protective equipment including clothing, a respirator, gloves, shoes, overalls, a face shield, and a hat rated for elevated temperatures of at least 500° F (260° C).
From: ThermoLazer SmartDie II Screed Box 3A1738K User Manual
How should the screed box be lifted to avoid injury?
You must use two hands, placing one hand on the yoke and one hand on the rod. Never pick it up with one hand or at one location.
From: ThermoLazer SmartDie II Screed Box 3A1738K User Manual
