Featured ALCOSAN manuals

ALCOSAN Green Stormwater Infrastructure and Source Control Monitoring Guide
This guide provides step-by-step instructions for planning and implementing flow monitoring for GROW-funded projects. It covers hydrologic performance, in-sewer flow, and data collection methods. Monitoring is required for all project types including GSI, I&I, DSIR, and SSP. The guide includes templates, equipment recommendations, and data analysis procedures.
The document is intended for ALCOSAN, municipalities, and sewer authorities to use in developing monitoring plans. It does not replace detailed protocols but provides a framework for compliance with GROW program requirements.
Covers: Introduction · Purpose and GROW Requirements · Monitoring Goals · Monitoring Process Overview · Source Control Monitoring Planning · Site Analysis & Monitoring Equipment
Latest ALCOSAN manuals
ALCOSAN Green Stormwater Infrastructure and Source Control Monitoring Guide
User Manual 63 pages · 2.3 MB · ENGuide for monitoring green stormwater infrastructure and source control projects funded by ALCOSAN’s GROW program.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in ALCOSAN manuals
What types of projects require monitoring under the GROW program?
Green Stormwater Infrastructure (GSI), Inflow/Infiltration controls (I&I), Direct Stream Inflow Removal (DSIR), and Sewer Separation Projects (SSP).
From: ALCOSAN Green Stormwater Infrastructure and Source Control Monitoring Guide
How long should pre- and post-construction monitoring last?
Minimum 3 months pre-construction and 6 months post-construction; recommended 6 and 12 months respectively.
From: ALCOSAN Green Stormwater Infrastructure and Source Control Monitoring Guide