Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-10-19
Featured Perma-Seal manuals

Perma-Seal Basement Waterproofing Homeowner's Manual
This document serves as a homeowner's manual for Perma-Seal basement waterproofing and drainage solutions. It covers interior crack repairs, interior drainage systems, and exterior excavations, providing guidance on maintenance, curing times for new concrete, and troubleshooting common issues like condensation versus seepage.
Covers: Interior Crack Repairs · Interior Drainage Systems · Exterior Excavations · Sump Pumps · Battery Backup Sump Pump Systems · Window Wells
Latest Perma-Seal manuals
Perma-Seal Basement Waterproofing Homeowner's Manual
User Manual 23 pages · 225 KB · ENThis manual provides homeowner instructions for Perma-Seal basement waterproofing, drainage, sump pump, and structural repair services.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in Perma-Seal manuals
How long does the epoxy odor persist?
It will normally dissipate within 24 hours with adequate ventilation.
Can I put down carpet or floor tile immediately?
No, it is recommended to wait 90 days to allow time for the curing process.
