Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2026-11-03
Featured USG Boral manuals

USG Boral Partiwall® Installation Manual NZ PB200/2
This manual provides installation instructions for USG Boral Partiwall® separating wall systems in New Zealand, designed for timber-framed buildings. It covers fire resistance ratings (FRR 60/60/60 and 90/90/90), acoustic performance (STC 55+), structural details, and materials required. The system uses Shaftliner™ fire barriers supported by aluminum clips to protect the structure on the non-fire side during a fire. Installation includes framing stage setup and plastering stage finishing.
The manual includes detailed drawings for junctions, penetrations, and configurations, and references compliance with NZBC and standards like AS/NZS 2588 and NZS 3604. It also outlines do’s and don’ts, installation steps, and technical support contacts.
Covers: Introduction · What is Partiwall®? · Features and Benefits · How Partiwall® Works · Fire · Acoustic
Latest USG Boral manuals
USG Boral Partiwall® Installation Manual NZ PB200/2
Installation Guide 32 pages · 2.2 MB · ENInstallation guide for USG Boral Partiwall® separating wall systems in New Zealand, covering fire resistance, acoustic performance, structural details, and…
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in USG Boral manuals
What is Partiwall®?
The Partiwall® system is a twin wall system that provides fire rated and acoustical performance when specified and installed in accordance with this document.
What fire resistance ratings does Partiwall® achieve?
Partiwall® achieves FRR 60/60/60 and 90/90/90, depending on the system type.
