Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2026-10-28
Featured International WELL Building Institute manuals

International WELL Building Standard Performance Verification Guide Manual
The document serves as a comprehensive guide for the performance verification stage of the WELL certification process. It details the procedures applicable to both WELL v1 and WELL v2 standards, including core and shell projects. The manual specifies that on-site inspections must be conducted by a designated WELL Performance Testing Agent followed by a review by GBCI.
Covers: Introduction · Performance Verification Overview · General Information and Arrangements · Sampling Point Selection · Equipment and Laboratory Requirements · Compliance Procedures
Latest International WELL Building Institute manuals
International WELL Building Standard Performance Verification Guide Manual
Other 42 pages · 6.7 MB · ENThis guide outlines the performance verification protocols for the WELL Health Building Standard, covering air, water, light, thermal comfort, and acoustics…
Questions answered in International WELL Building Institute manuals
What is the required height range for air sampling points above the finished floor?
Sampling points must be located between 1.1 and 1.7 meters above the finished floor.
From: International WELL Building Standard Performance Verification Guide Manual
What is the minimum distance required between a sampling point and walls or doors?
Sampling points must be at least 1 meter away from walls, doors, and air vents.
From: International WELL Building Standard Performance Verification Guide Manual