Key facts
- Manuals
- 1
- Languages
- ZH
- Last added
- 2026-10-25
Featured Lianhua manuals

Lianhua 5B-3B(N) Total Nitrogen Detector Quick User Guide
This document serves as a quick reference guide for the Lianhua 5B-3B(N) Total Nitrogen Detector. It outlines essential preparation steps, including cleaning glassware and preparing specific reagents like alkaline oxidant and hydrochloric acid solutions required for testing.
The guide details the complete measurement workflow: starting with instrument warm-up, followed by sample digestion at 120°C using a dedicated digester, cooling, colorimetric analysis in quartz cuvettes, and final data reading. It also includes important safety precautions and troubleshooting advice. This manual is written in Chinese.
Covers: Preparation Work · Reagent Preparation · Water Sample Measurement · Instrument Operation · Safety Precautions
Latest Lianhua manuals
Lianhua 5B-3B(N) Total Nitrogen Detector Quick User Guide
User Manual 2 pages · 2.6 MB · ZHThis quick user guide provides instructions for preparing reagents, operating the Lianhua 5B-3B(N) total nitrogen detector, and performing water sample…
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in Lianhua manuals
What temperature is required for the digestion process?
The digestion system must be heated to 120°C before measurement.
From: Lianhua 5B-3B(N) Total Nitrogen Detector Quick User Guide
What wavelength is used for the initial measurement?
The measurement wavelength must be adjusted to 220 nm before testing.
From: Lianhua 5B-3B(N) Total Nitrogen Detector Quick User Guide
