Maxxon Manuals

ManualLib has 1 Maxxon manual. Every file can be read online or downloaded as a PDF for free.

Datasheet 1

Key facts

Manuals
1
Languages
EN
Last added
2026-11-22

Latest Maxxon manuals

Which document do I need?

Datasheet

Ratings, dimensions and ordering codes, for selection and design work.

Questions answered in Maxxon manuals

What are the drying times for different thicknesses?

Drying time is usually 5 to 7 days for a 3/4" (19 mm) thickness and 7-10 days for a 1" (25 mm) thickness.

From: Maxxon Commercial Pro Level-Crete Underlayment Technical Data Sheet

Can this product be used on wood subfloors?

Yes, it can be used in wood frame applications with a minimum thickness of 3/4" (19 mm) and must be primed with a Maxxon floor primer.

From: Maxxon Commercial Pro Level-Crete Underlayment Technical Data Sheet