Key facts
- Manuals
- 2
- Languages
- ES · EN
- Last added
- 2023-11-18
Featured Magnetrol manuals

Magnetrol Eclipse 705 Radar Level Transmitter Installation and Operation Manual
This manual provides instructions for the installation and operation of the Magnetrol Eclipse 2nd Generation 705 Radar Guided Wave Level Transmitter. It covers quick start procedures for mounting, cabling, and configuring the device, as well as detailed installation steps for various probe types including coaxial, twin rod, and single rod probes. Safety warnings regarding high voltage and explosion hazards are included. This manual is written in Spanish.
Covers: Instalación de inicio rápido · Instalación completa · Cableado · Configuración del transmisor · Comunicaciones digitales Foundation Fieldbus · Información de referencia

Magnetrol B73 and Series 75 Liquid Level Switches Installation and Operating Manual
This document serves as the Installation and Operating Manual for Magnetrol B73 and Series 75 Liquid Level Switches. It outlines critical safety warnings, such as explosion hazards and low voltage directives, and details the proper sequence for unpacking, inspecting, and installing the equipment. The guide emphasizes correct mounting within 3° of vertical and proper piping configurations to ensure accurate level indication.
Covers: Installation · Critical Alarm Function · Piping · Mounting · Wiring · Description
Latest Magnetrol manuals
Magnetrol Eclipse 705 Radar Level Transmitter Installation and Operation Manual
User Manual 71 pages · 7.3 MB · ESSpanish installation and operation manual for the Magnetrol Eclipse 2nd Generation 705 Radar Guided Wave Level Transmitter.
Magnetrol B73 and Series 75 Liquid Level Switches Installation and Operating Manual
User Manual 28 pages · 763 KB · ENThis manual provides installation, operating, and maintenance instructions for Magnetrol B73 and Series 75 sealed external cage liquid level switches.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in Magnetrol manuals
What is the minimum power supply requirement for the transmitter?
The system requires a 24 VDC power source capable of providing at least 23 mA.
From: Magnetrol Eclipse 705 Radar Level Transmitter Installation and Operation Manual
What is the maximum liquid level allowed above the process connection?
The maximum overflow level must be at least 6 inches (150mm) below the process connection.
From: Magnetrol Eclipse 705 Radar Level Transmitter Installation and Operation Manual
What is the warranty period for MAGNETROL mechanical level controls?
All MAGNETROL mechanical level and flow controls are warranted free of defects in materials or workmanship for five full years from the date of original factory shipment.
From: Magnetrol B73 and Series 75 Liquid Level Switches Installation and Operating Manual
How should the B73 and Series 75 controls be mounted?
The controls must be mounted within 3° of vertical in all directions, which is noticeable by eye but should be checked with a spirit level.
From: Magnetrol B73 and Series 75 Liquid Level Switches Installation and Operating Manual
