Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-10-20
Featured Fortress Building Products manuals

Fortress Building Products EVOLUTIONTM STEEL DECK FRAMING Installation Guide
This guide provides step-by-step instructions for installing the EVOLUTIONTM STEEL DECK FRAMING system, including project planning, cutting and painting, framing connections, and care and maintenance. It emphasizes safety, code compliance, and proper tool usage. The guide also references span charts and warranty information for reference.
The installation process covers mounting S-Ledger to structure, installing posts to footings, beams, joists, and caps, as well as connecting U-Rim Joists and Evolution Straps. It includes detailed sections on required tools, components, and safety precautions, such as wearing PPE and cleaning metal shavings.
Covers: Introduction · Required Tools/Components · Installation Overview · Project Planning · Cutting & Painting · Framing Connections
Latest Fortress Building Products manuals
Fortress Building Products EVOLUTIONTM STEEL DECK FRAMING Installation Guide
Installation Guide 38 pages · 9.2 MB · ENInstallation guide for Fortress Building Products' steel deck framing system, covering project planning, cutting, painting, connections, and maintenance.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in Fortress Building Products manuals
What safety precautions should be taken during installation?
Personal Protection Equipment (PPE) must be worn anytime using power tools or working with Evolution framing. This includes eye protection, hearing protection, closed-toe shoes, gloves, long sleeves, and pants.
From: Fortress Building Products EVOLUTIONTM STEEL DECK FRAMING Installation Guide
Where can I find span charts for this framing system?
Reference https://bpdirectory.intertek.com/ for span charts. Search for CCRR #0313.
From: Fortress Building Products EVOLUTIONTM STEEL DECK FRAMING Installation Guide
