Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-10-31
Featured Emriver manuals

Friends of the Winooski River Emriver Em2 Stream Table Rental Program Manual
Friends of the Winooski River offers the Emriver Em2 river process simulator, also called the stream table, for classroom or program use. This manual states renter responsibilities for pickup, transport, setup, takedown, and return, and requires following the Little River Research & Design manual for assembly and operation.
It includes a specifications table for the table, kit, modeling media, reservoir, pump, and system weights, plus a parts and accessories checklist and photo guide for storage. All parts must be dry before storage, and the red box and backpack must be kept in a heated space.
Covers: Transporting · Set up · Take down · Specifications of FWR's Emriver Stream Table and Kit · FWR Parts and Accessories Checklist · FWR Parts and Accessories Photo Guide
Latest Emriver manuals
Friends of the Winooski River Emriver Em2 Stream Table Rental Program Manual
User Manual 7 pages · 526 KB · ENRental program manual for the Emriver Em2 stream table, covering transport, setup, takedown, parts, and specifications.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in Emriver manuals
How many people are needed to pick up and drop off the stream table?
Two people are required.
From: Friends of the Winooski River Emriver Em2 Stream Table Rental Program Manual
How long does setup take?
Setup takes approximately 45 minutes with two people.
From: Friends of the Winooski River Emriver Em2 Stream Table Rental Program Manual
