Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-10-20
Featured Eagle Eye Power Solutions manuals

Eagle Eye Power Solutions LB-60-57 Load Bank User Manual
This manual provides step-by-step instructions for operating the LB-60-57 load bank, including setup, testing procedures for single-phase and three-phase systems, and servicing guidelines. It includes wiring diagrams, control panel descriptions, and safety precautions. The load bank is rated for 57 kW at 480VAC and 43 kW at 208VAC, with seven adjustable load steps. It is designed for temporary field use and must be operated only by qualified personnel.
Covers: Purpose of Load Bank · Rating of Load Bank · Load Bank Description · Control Panel Layout · Control Description · Operation Testing (120VAC Single Phase)
Latest Eagle Eye Power Solutions manuals
Eagle Eye Power Solutions LB-60-57 Load Bank User Manual
User Manual 22 pages · 991 KB · ENUser manual for the LB-60-57 portable load bank, covering operation, wiring, servicing, and safety for testing 120V, 208V, 240V, and 480V power systems.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in Eagle Eye Power Solutions manuals
What is the rated power of the LB-60-57 at 240VAC?
The LB-60-57 is rated at 57 KW full load when the input voltage is 240VAC.
From: Eagle Eye Power Solutions LB-60-57 Load Bank User Manual
What is the total load at 208VAC three phase?
The total load at 208VAC three phase is 43KW.
From: Eagle Eye Power Solutions LB-60-57 Load Bank User Manual
