Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-10-18
Featured Acuity Controls manuals

Acuity Controls nLight® Devices User Manual
This guide helps users quickly set up and operate nLight® devices. It covers basic terminology, device connection using CAT-5e cabling, power budgeting, and troubleshooting via LED blink codes. The guide assumes familiarity with nLight concepts and CAT-5e wiring.
Installation involves daisy-chaining devices on a single bus, ensuring proper power distribution, and recording device locations for future reference. Devices communicate using TIA-485 standard and can be configured via LED patterns and push buttons.
Covers: Terminology · Out of the Box Functionality · Bus Power Budget Considerations · Connecting Devices · Control Zone Interconnection · Troubleshooting Tips
Latest Acuity Controls manuals
Acuity Controls nLight® Devices User Manual
User Manual 8 pages · 1.2 MB · ENA pocket guide for nLight® devices covering terminology, setup, power budgeting, device connection, troubleshooting, and installation best practices.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in Acuity Controls manuals
What is the maximum cable length for an nLight Control Zone?
The maximum cable length for a zone is 1500 feet.
How do I ensure proper power distribution in an nLight Control Zone?
Place power-supplying devices mid-zone and calculate power load to ensure adequate voltage for all devices.
