Agilent Qualification Opérationnelle/Vérification des Performances (OQ/PV) des chromatographes en phase gazeuse série Agilent 6850 Manual

Update: 28 September, 2023

This document describes the Operational Qualification/Performance Verification (OQ/PV) procedures for Agilent Technologies 6850 Series Gas Chromatographs (GCs). The procedures involve internal tests and analytical methods using certified samples to evaluate instrument performance and verify that the instrument is functioning properly according to specifications. To minimize laboratory downtime and maintain productivity, the OQ/PV testing procedure can generally be completed in one day. The document also provides prerequisites for executing the procedure and suggests the order of tests. Additionally, it notes that acceptance criteria should be defined based on analytical needs and consultation with Agilent.


File format: PDF

Size: -

MD5 Checksum: 14765543DBDD39E6250E342A6B4E0B73

Publication date: 06 July, 2012

Downloads: -

PDF Link: Agilent Qualification Opérationnelle/Vérification des Performances (OQ/PV) des chromatographes en phase gazeuse série Agilent 6850 Manual PDF

Also Manuals