Key facts
- Manuals
- 4
- Languages
- ZH
- Last added
- 2012-06-11
Featured APEX manuals

APEX DYNAMICS 2PB2-C Installation Manual
This manual provides step‑by‑step instructions for installing and securing the 2PB2‑C motor. It covers removal of the original motor, proper alignment of the motor shaft, and recommended tightening procedures.
The document includes detailed torque tables for the various fasteners used in the motor and gearbox assembly, specifying the required tightening torque for each screw size to ensure reliable operation. This manual is written in Chinese.
Covers: Motor Removal · Installation Procedure · Fastener Torque Tables · Torque Verification · Safety Guidelines
Latest APEX manuals
Apex Signal A Division of NAI Inc PC104-73DL1 LVDT/RVDT OUTPUT PROGRAMMABLE 16 BIT RESOLUTION; WRAP-AROUND SELF TEST ON-BOARD PROGRAMMABLE EXCITATION SUPPLY (OPTIONAL)
This document is the specification sheet for the PC104-73DL1 product produced by Apex Signal, A Division of NAI, Inc. PC104-73DL1 is a programmable 16-bit resolution LVDT/RVDT output product with envelope self-test and optional programmable excitation supply.
APEX PA09 PA09A handbook
The PA09 is a high voltage, high output current operational amplifier optimized to drive a variety of loads from DC through the video frequency range. It features power MOS technology with a 2A peak rating, a high gain bandwidth product of 150MHz, a very fast slew rate of 200V/µs, a protected output stage with thermal shutoff, excellent linearity with Class A/B output, a wide supply range of ±12V to ±40V, and low bias current and low noise with FET input.
APEX PA78 Manual
The PA78 is a high voltage, high speed Precision IC power op amp with performance and unique features not found previ- ously in any commercially available OpAmp .
APEX DYNAMICS 2PB2-C Installation Manual
Installation Guide 2 pages · 4.6 MB · ZHInstallation guide for the APEX DYNAMICS 2PB2-C motor, including assembly steps and torque specifications.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in APEX manuals
What torque should be applied to an M4 x 0.7P screw during installation?
The recommended tightening torque for an M4 x 0.7P screw is 3 Nm.
How much torque is required for an M6 x 1P fastener?
An M6 x 1P fastener should be tightened to 5 Nm.
