APEX Manuals

ManualLib has 4 APEX manuals. Every file can be read online or downloaded as a PDF for free.

Installation Guide 1

Key facts

Manuals
4
Languages
ZH
Last added
2012-06-11

Latest APEX manuals

  • Apex Signal A Division of NAI Inc PC104-73DL1 LVDT/RVDT OUTPUT PROGRAMMABLE 16 BIT RESOLUTION; WRAP-AROUND SELF TEST ON-BOARD PROGRAMMABLE EXCITATION SUPPLY (OPTIONAL)

    This document is the specification sheet for the PC104-73DL1 product produced by Apex Signal, A Division of NAI, Inc. PC104-73DL1 is a programmable 16-bit resolution LVDT/RVDT output product with envelope self-test and optional programmable excitation supply.

  • APEX PA09 PA09A handbook

    The PA09 is a high voltage, high output current operational amplifier optimized to drive a variety of loads from DC through the video frequency range. It features power MOS technology with a 2A peak rating, a high gain bandwidth product of 150MHz, a very fast slew rate of 200V/µs, a protected output stage with thermal shutoff, excellent linearity with Class A/B output, a wide supply range of ±12V to ±40V, and low bias current and low noise with FET input.

  • APEX PA78 Manual

    The PA78 is a high voltage, high speed Precision IC power op amp with performance and unique features not found previ- ously in any commercially available OpAmp .

  • APEX DYNAMICS 2PB2-C Installation Manual

    Installation Guide 2 pages · 4.6 MB · ZH

    Installation guide for the APEX DYNAMICS 2PB2-C motor, including assembly steps and torque specifications.

Which document do I need?

Installation Guide

Mounting, wiring and first power-up. Read it before the hardware goes in.

Questions answered in APEX manuals

What torque should be applied to an M4 x 0.7P screw during installation?

The recommended tightening torque for an M4 x 0.7P screw is 3 Nm.

From: APEX DYNAMICS 2PB2-C Installation Manual

How much torque is required for an M6 x 1P fastener?

An M6 x 1P fastener should be tightened to 5 Nm.

From: APEX DYNAMICS 2PB2-C Installation Manual