How should the TE‑OAT transformer be wired for an AC dielectric test?

Connect the low‑voltage input terminals a, x to the primary winding, use the measurement terminals E, F for the instrument, and connect the high‑voltage output terminals A, X to the test specimen as shown in Figure 6.

From: Wuhan Testyle TE-OAT/TE-ODT Transformer User Manual

How is the nominal transformer capacity calculated?

Use the formula Pn = k·Vn²·Ct·10⁻⁹, where Vn is the rated output voltage, Ct is the test specimen capacitance, and k is the safety factor based on Vn.

From: Wuhan Testyle TE-OAT/TE-ODT Transformer User Manual

What is the input voltage for the TE‑SBP generator?

The generator accepts a three‑phase 380 V, 50 Hz sinusoidal input.

From: TE TE-SBP Triple-Frequency High Voltage Generator Manual

How long can the generator run under load?

It can operate under load for 40 to 60 seconds.

From: TE TE-SBP Triple-Frequency High Voltage Generator Manual