R200 Service Manual
This manual provides detailed instructions for preparing the R200 pressure regulator system, including safety warnings, system pressurization, and depressurization steps. It explains the required checks before operation, such as ensuring all valves are closed and the system is fully depressurized.
The document also outlines the adjustment sequence for the monitor and actuator, pressure set‑point selection guidelines, and troubleshooting tips for leaks and contamination. Recommended limit‑setting ranges and pressure set‑point formulas are included to achieve stable control. This manual is written in Chinese.
Covers: Precautions and Safety Warnings · System Start‑up and Depressurization · Adjustment Sequence for Monitor and Actuator · Limit‑setting Recommendations · System Lock and Leak Checks · Pressure Set‑point Selection
Latest R20操作维护手册 manuals
R200 Service Manual
Service Manual 4 pages · 100 KB · ZHService manual describing setup, adjustment, and safety procedures for the R200 pressure regulator system.
Which document do I need?
Service Manual
Disassembly, diagnostics and part numbers, for repair.
Questions answered in R20操作维护手册 manuals
What is the recommended limit‑setting range for the regulator?
The limit‑setting should be set between 1.0 and 2.0 for most applications.
From: R200 Service Manual
How should the system be depressurized before adjusting the monitor screw?
Close the inlet valve, then gently open the downstream valve until the system is fully depressurized before turning the monitor adjustment screw.