Key facts
- Manuals
- 2
- Languages
- EN
- Last added
- 2012-04-09
Featured acopos manuals

ACOPOS MAACPSH-X Installation Guide
This guide provides comprehensive safety guidelines for handling the ACOPOS MAACPSH‑X servo drive. It warns of hazardous voltage‑carrying parts, hot surfaces, and moving machine components, and specifies that all transport, installation, commissioning and service work must be performed only by qualified personnel.
The document also details installation precautions, including proper earthing, covering of voltage‑carrying parts, a required intermediate‑circuit discharge time of at least five minutes, and verification that the intermediate‑circuit voltage is below 42 V DC before any work is started.
Covers: Safety Guidelines · Qualified Personnel · Earthing Requirements · Intermediate Circuit Discharge Time · Maximum Intermediate Circuit Voltage
Latest acopos manuals
ACOPOS Manual
This manual introduces safety, installation, dimensions, wiring, etc. of ACOPOS series products.
ACOPOS MAACPSH-X Installation Guide
Installation Guide 32 pages · 278 KB · ENSafety guidelines and installation instructions for the ACOPOS MAACPSH‑X servo drive, intended for qualified personnel.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in acopos manuals
What discharge time is required before working on the servo drive?
You must wait at least five minutes for the intermediate circuit to discharge, and verify that the voltage is below 42 V DC before starting work.
