Key facts
- Manuals
- 1
- Languages
- ZH
- Last added
- 2026-10-03
Featured 朗宇芯 manuals

Langyuxin SIMPK01/02 Dual/Single Axis Robotic Arm Control System Operation Manual
This manual covers safety reminders, system installation, and comprehensive operating instructions for the SIMPK01/02 dual/single‑axis robotic arm control system. It includes detailed descriptions of the control panel, manual and automatic operation modes, function settings, servo parameters, and programming guidance.
The document also provides wiring diagrams for various servo drivers, I/O connections, and integration with injection molding machines, along with fault alarm handling and maintenance recommendations to ensure reliable and safe operation. This manual is written in Chinese.
Covers: Safety Reminders and System Installation · Operation Instructions · Standard Motion Programs · Fault Alarms and Handling · I/O Input/Output Wiring Diagrams · Servo Driver Wiring Instructions
Latest 朗宇芯 manuals
Langyuxin SIMPK01/02 Dual/Single Axis Robotic Arm Control System Operation Manual
User Manual 48 pages · 3.2 MB · ZHThe Langyuxin SIMPK01/02 operation manual provides safety guidelines, installation steps, and detailed instructions for using the dual/single‑axis robotic…
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in 朗宇芯 manuals
How is the origin return performed before automatic operation?
After the system is powered on, press the origin return key on the control panel; the system will not allow automatic operation until the origin return is completed.
From: Langyuxin SIMPK01/02 Dual/Single Axis Robotic Arm Control System Operation Manual
