Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2026-09-28
Featured ELECRAFT manuals

Elecraft HG 144-K Transverter Installation Guide
The HG 144‑K is an internal transverter designed for the Elecraft K3, converting a 28 MHz IF to a 144 MHz output. It features a low‑noise amplifier (<1 dB NF) and high third‑order intercept (>+29 dBm) without needing an external power supply.
The manual provides step‑by‑step installation instructions, including soldering three wires, connecting two coaxial cables, and mounting the antenna connector. After assembly, the transverter is enabled via the K3 menu (XV1 settings) and ready for operation on the 144 MHz band.
Covers: Specifications · Installation Procedure · Menu Setup · Performance Measurements · Contact Information
Latest ELECRAFT manuals
Elecraft HG 144-K Transverter Installation Guide
Installation Guide 21 pages · 1.4 MB · ENInstallation guide for the Elecraft HG 144‑K internal transverter, covering specs, wiring and setup for the K3 transceiver.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in ELECRAFT manuals
How long does the installation of the HG 144‑K take?
The installation requires about 30 minutes of work.
What voltage does the transverter need for power?
It uses the internal 12 VDC supply from the Elecraft K3.
