Key facts
- Manuals
- 1
- Languages
- ZH
- Last added
- 2012-03-13
Featured PS100/PS100K manuals

Opine PS100/PS100K & TS100 Switch User Manual
This manual outlines important safety precautions for the PS100/PS100K pressure series and TS100 temperature series switches, including handling of the delicate pressure membrane, limits on drop height, and adherence to voltage and pressure ratings. It also advises regular preventive maintenance and monitoring of the device.
Detailed wiring instructions, installation guidelines, and setting procedures are provided, covering wire size recommendations, connection to the 1/2" NPT electrical interface, terminal assignments, and adjustment of the set point using a calibration bench and multimeter. Warranty and after‑sales service information are included at the end. This manual is written in Chinese.
Covers: Precautions · Wiring Instructions · Setting Procedure · Installation · Setting Range · Warranty
Latest PS100/PS100K manuals
Opine PS100/PS100K & TS100 Switch User Manual
User Manual 2 pages · 183 KB · ZHThe Opine PS100/PS100K and TS100 switch manual provides safety precautions, wiring, installation, and setting instructions.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in PS100/PS100K manuals
What safety precautions should be taken when handling the switch?
Do not probe the pressure membrane with objects, ensure the measurement medium does not affect the membrane, avoid drops over 2 m, and stay within the specified voltage and pressure limits.
How should the switch be wired?
Cut all wires before connecting, use a maximum wire size of 14 AWG, connect to the 1/2" NPT electrical interface, and attach wires to terminals 1 (common), 2 (normally open), and 3 (normally closed) as required.
