Key facts
- Manuals
- 1
- Languages
- ZH
- Last added
- 2012-03-12
Featured GJD manuals

GJD D-TECT Detector Installation Manual
This manual describes the proper mounting location and steps to securely attach the D-TECT detector to a wall using the provided base template. After fixing the base, the detector is mounted, wired to a 12 VDC power source and signal lines, and checked for stable installation.
After power‑up the detector performs a 2‑3 minute self‑test. Programming can be done via the built‑in programming key or an infrared remote within five minutes of power‑up. The guide provides the programming table for detection distance, pulse count, LED status, illumination levels, signal control and timer settings, and explains how to adjust the detector’s orientation. This manual is written in Chinese.
Covers: Installation Location · Mounting Procedure · Wiring Connections · Power‑Up Self‑Test · Programming Parameters · Manual Programming
Latest GJD manuals
GJD D-TECT Detector Installation Manual
Installation Guide 3 pages · 2.3 MB · ZHInstallation guide for the GJD D-TECT detector covering mounting, wiring, power‑up self‑test and programming.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in GJD manuals
How long does the detector self‑test after power‑up?
The detector performs a self‑test that lasts about 2‑3 minutes after power is applied.
