Key facts
- Manuals
- 1
- Languages
- ZH
- Last added
- 2026-10-01
Featured Roachelab manuals

Roachelab Q-SUN and QUV Test Equipment Installation Conditions
The guide provides the necessary installation conditions for Roachelab's Q‑SUN sunlight fastness testers and QUV ultraviolet aging testers. It specifies the required voltage, water pressure, drainage pipe size and ambient environment for each model.
A table of model‑specific values is included, covering models such as Xe‑1‑B, Xe‑2‑H, Xe‑3‑H, QUV/SE and QUV/Spary, along with the company's contact information for further assistance. This manual is written in Chinese.
Covers: Installation Requirements · Model‑Specific Conditions · Contact Information
Latest Roachelab manuals
Roachelab Q-SUN and QUV Test Equipment Installation Conditions
Installation Guide 1 pages · 179 KB · ZHThis document lists the water, electricity, gas and environmental requirements for installing Roachelab Q‑SUN and QUV test machines.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in Roachelab manuals
What voltage is required for the Xe-2-H model?
The Xe-2-H model requires a 220 V power supply.
From: Roachelab Q-SUN and QUV Test Equipment Installation Conditions
What is the required drainage pipe size for the QUV/SE equipment?
The QUV/SE equipment needs a 32 mm drainage pipe.
From: Roachelab Q-SUN and QUV Test Equipment Installation Conditions
